Design and Build Construction of a 500 m long composite tunnel in Epique Island Project in Bodrum. We have used structural steel, prefabricated concrete and filigran plates in order to construct the whole structure in 8 weeks without interrupting the traffic flow.
Year: 2017
Location: BODRUM
Client: AKSOY İNŞAAT